Data Center Working Group
Established: 2002
Ended: 2018 (Absorbed by the Infrastructure Committee)
Chair: Carey Noll
Mailing Group: Data Center Mailing List
Background, Definitions and Responsibilities
IGS data centers fall into three categories: Operational, Regional, and Global Data Centers.
Operational Centers are in direct contact with tracking sites. Their tasks include station monitoring, data validation, suitable data reformatting into an exchange format (RINEX), compression of data files, maintenance of a local archive of the tracking data in its original receiver format and the exchange format, and the electronic transmission of data in exchange format to a Regional or Global Data Center. The Operational Center must download data from the receivers located at IGS stations on a timely basis without interruption, or as specified to meet the requirements of at least one type of IGS product. Details are available in the “IGS Site Guidelines” document. Operational Centers may or may not allow users direct access to their data holdings.
Regional Data Centers collect tracking data in exchange format from several Operational Centers and/or stations, maintain a local archive of the data received, provide on-line access to these data to the user community of the region, and transmit data from a subset of their sites (minimally, IGS reference frame stations) to the Global Data Centers. The set of stations archived may be either a limited geographic region (e.g., Europe, Australia, etc), or those stations managed by the archiving agency.
The Global Data Centers are the main interfaces to the Analysis Centers and the user community in general. They receive/retrieve, archive, and provide online access to tracking data provided by the Operational/Regional Data Centers. At a minimum, Global Data Centers archive 30-second sampling interval data from IGS sites identified as reference frame stations. The Global Data Centers also archive and provide online access to IGS products. Finally, the IGS Global Data Centers backup and secure their holdings of IGS data and products, exchanging data between other data centers in order to ensure equalization of data holdings.
Although station operators are required to validate data prior to transmission, data centers at all levels should also perform routine quality control on incoming data as additional prevention of providing bad or corrupt data.
Data Center Contents
All DCs should retain logs of IGS data and product file retrievals for at least one year, but preferably indefinitely. The CB may request such information from time to time, for the purpose of collecting statistics on the usage of IGS data and products.
The online archive of GNSS data available through the IGS Global Data Centers should include:
- Daily files of GNSS data (minimum all IGS reference frame stations) at a 30-second sampling rate (minimum of one year online; older data may be near-line).
- Hourly files of GNSS data at a 30-second sampling rate (minimum of three days online; older data may be purged)
- High-rate, low-latency GNSS data.
All data should be available in RINEX format, both Hatanka-compacted and Unix (.Z)-compressed. The data archive should also include broadcast ephemeris, and meteorological RINEX files. Data Centers should provide information that summarizes archive contents on a daily basis to aid in the monitoring of station data quality and data center contents.
The online archive of IGS products available through the IGS Global Data Centers should include:
- Weekly solutions of classic IGS Final products from the IGS Analysis Centers
- Combined weekly solution from the IGS Analysis Center Coordinator
- Daily rapid and sub-daily ultra-rapid solutions from the IGS Analysis Center Coordinator
- Weekly and cumulative combined station coordinates and velocities from IGS Reference Frame Coordinator
- Associate Analysis Center products as they are approved by the IGS Governing Board as Pilot Projects or Working Groups, including:
- GLONASS orbits
- Regional and Global Network Analysis Center solutions in SINEX format
- Zenith path delay files from the Troposphere Working Group
- Ionosphere parameters from the Ionosphere Working Group
New Data Centers
Proposals for a new Data Center should begin with a conversation with the Data Center Working Group (DCWG). The DCWG and Central Bureau can assist in bringing a letter stating the agency’s qualifications, commitment, and plans to the GB. Based on recommendations of the DCWG, and demonstrated commitment of the host organization, the proposed DC will be evaluated and considered for approval by the GB.
[Last updated December 2010]
Data Center Working Group Members
[updated 2013 – source: 2013 Component Report]
Name | Institution | Country/Region |
---|---|---|
Carey Noll, Chair | NASA GSFC | USA |
Yehuda Bock | SIO | USA |
Ludwig Combrinck | HRAO | South Africa |
Bruno Garayt | IGN | France |
Heinz Habrich | BKG | Germany |
Michael Moore | GA | Australia |
Ruth Neilan | JPL | USA |
Markus Ramatschi | GFZ | Germany |
Jim Ray | NGS | USA |
Nacho Romero | ESA | Germany |
Mike Schmidt | NRCan | Canada |
Giovanni Sella | NGS | USA |
Grigory Steblov | RDAAC | RUSSIA |
Dave Stowers | JPL | USA |
Last Updated on 1 Jun 2023 18:50 UTC